Field visit to LeTV’s 20 billion car site: Jingxian police station

At the end of 2016, LeTV, which was deeply involved in various negative rumors, resolutely announced that it had won 290,400 square meters of industrial land in the northern village of Deqing, Zhejiang Deqing Economic Development Zone for 279 million yuan. The Leshi Auto Eco-industrial Park officially started construction. At that time, the report stated: "With the launch of dozens of excavators, rock drills and other heavy machinery, on December 28, 2016, Levision officially broke ground in the automobile ecological base in Moganshan, Deqing, Zhejiang." After more than two months passed, LeTV was caught in a new round of crisis. What happened to LeTV’s project? The Securities Times Network deliberately went for a number of expeditions. Deqing County, Zhejiang Province is located in the north of Hangzhou, close to the Yuhang District of Hangzhou. It is a small county town and is famous for the introduction of the LeTV Eco-Industrial Park. It is understood that the industrial park is still about 20 minutes away from the county town. It was once the largest “open-air quarry” in Zhejiang Province. It has an area of ​​70-80 football stadiums, and was later planned to become the northern park of the Moganshan Hi-tech Zone. . Compared to the end of last year, billboards in the township of “Deqing Smart Car” set up by the roadside have been replaced by the “Landscape View of Leshi Eco-Cars (Zhejiang) Project”. The original shed on the construction site has not been found, and instead it is “LeTV Eco-Car”. Industrial Park Project Manager. The project management department is composed of movable board houses, two floors up and down, about 20 rooms, including the director's room, design room, and workers' dormitory. It covers an area of ​​about 2 basketball courts, which is comparable to the 43,000-mu industrial park with a planned area of ​​43,000 mu. Very small. A middle-aged leader was very refusal to interview and said, "We just do things. How do we do what we do," and asked the guard to drive away the reporter. A person who claims to be Le Vision said: “The project is only a small-scale construction. After this large-scale start, it will be a lively event.” At the scene, it can be found that there is no fence around the industrial park, and it is an open, undeveloped land. Looking ahead, unleveled and partially low-lying areas have formed ponds and reeds because of the deep water, and some places have Reeds are higher than people. The project currently under construction has a small footprint, and more than 10 excavators and rock drills are currently working. The construction worker said: “The project under construction is a workshop. According to the project party’s requirements, a 4 meter deep foundation is currently being excavated.” Interestingly, there is also a renovated police room near the project manager. It is particularly eye-catching on a deserted site. There are police officers and patrol cars. This is rare. Two related sources disclosed that this is "Afraid of trouble, you have not seen the project site here in trouble," but the specific situation is not known.